Caree Maintenance Logbook

Sunday 08th, May, 2022

  • Bow spit Board
    Sand down top of bowspit board and apply a second coat of white flowcoat
    Bowspit Second Flowcoat
    Bowspit Second Flowcoat
Saturday 07th, May, 2022

  • Bow spit Board
    Sand bow spit board and Hawsepipe block
    Bowspit Sanded
    Bowspit Sanded
    Hawsepipe Top Sanded
    Hawsepipe Top Sanded
  • Bow spit Board
    Apply a coat of white flowcoat to top of bow spit board
  • Anchor Windlass
    Apply a coat of white flowcoat to hawse pipe / de-spooler block
    Hawsepipe Flowcoat Top
    Hawsepipe Flowcoat Top
    Hawsepipe Flowcoat Lower
    Hawsepipe Flowcoat Lower
  • Bow spit Board
    Apply a coat of white flowcoat to lower side of bow spit board
    Bowspit Lower Flowcoat
    Bowspit Lower Flowcoat
Thursday 05th, May, 2022

  • Bow spit Board
    Sand vinyl ester drips from bow spit board
  • Anchor Windlass
    Sand vinyl ester drips from hawse pipe / de-spooler
  • Bow spit Board
    Apply a coat of 250 CSM to top of bow spit board
    Bowspit CSM
    Bowspit CSM
  • Anchor Windlass
    Apply a coat of 250 CSM to lower side of hawse pipe / de-spooler block
    Hawsepipe Block Top CSM
    Hawsepipe Block Top CSM
Tuesday 03rd, May, 2022

  • Bow spit Board
    Apply a coat of vinyl ester to bow spit board