Caree Maintenance Logbook

Sunday 24th, April, 2022

  • Anchor Windlass
    Remove wooden block that holds the chain hawse pipe and windlass de-spooler to fiberglass laminate the wooden block
    Hawsepipe Block
    Hawsepipe Block
  • Check battery charging
    Batteries at full charge
Thursday 21st, April, 2022

  • Check engine bilge
    A little diesel around transfer pump. Few ml. Monitor. The hose did slip out when diesel was transferred last
  • Check mid bilge
    Approximately 1mm fresh water. Assume left over from removal of shower bilge box - Monitor
  • Check shaft seal / Stuffing box
    1 ~ 2 ml in container - Monitor
  • Bow spit Board
    Board running along top of bow spit has a split in the fiberglass lamination. Remove to repair.
  • Bow spit Board
    Drop head sail, fold and take home to wash, secure all ropes from head sail
  • Bow spit Board
    Remove main and secondary anchors from bow spit and secure anchors and chains
    Bowspit
    Bowspit
    Bowspit Damage
    Bowspit Damage
Tuesday 19th, April, 2022

  • Outboard Maintenance
    Order parts from Aquasportmarine.com.au
  • Check bilge - Stuffing Box
    Approx 15ml in container. Dry container out and tighten seal by about 5~10 degree rotation - Monitor