Caree Maintenance Logbook

Sunday 12th, March, 2023

  • Clean Heads
    Clean forward head
    Clean aft head
  • Charge Batteries
    Plug shore power in to charge batteries.
    Both solar panels covered in dust / dirt.
  • Wash solar panels
    Both house panel on Davits and starter solar panel on dodger roof covered in dust from dust storm. Wash both. Increase in power
  • Move main boom
    Move main boom to reduce shading on solar panel on dodger roof
  • Run engine
    Start engine Time: 17:25 Hours: 920.4
    Run engine till warm, then power up in reveres and forward.
    Stop engine Time: 18:00 Hours: 921
  • Check mid bilge
    Drain fresh water.
    Drain fresh water tank so it does not leak while away.
  • Install Shower Bilge
    Instal shower bilge onto new shelf and connect pipes.
    Installed shower bilge
    Installed shower bilge
Sunday 26th, February, 2023

  • Check engine bilge
    Dry, perfect.
Sunday 19th, February, 2023

  • Check mid bilge
    Fresh water in bilge. Tank to be checked for leak.
  • Run engine
    Run engine to warm up and flow oil
    Start: 920.0
    Stop: 920.4